0
Skip to Content
Channel Deepening Project
Home
Project Overview
Meetings
Documents
Contact
Channel Deepening Project
Home
Project Overview
Meetings
Documents
Contact
Home
Project Overview
Meetings
Documents
Contact

Draft Integrated FIS/EIS

Project Overview
Executive Summary
Draft Integrated FS/EIS Main Report

  • Appendix A: Notice of Intent (NOI) Comments

  • Appendix B: Economic Report

  • Appendix C: Engineering Report

    • Appendix C-1: Geotechnical Analysis

      • Appendix C-1a: Geotechnical Report Attachments

    • Appendix C-2: Coastal Engineering Report

    • Appendix C-3: Vessel Simulation Report

  • Appendix D: Dredged Material Management Plan (DMMP)

  • Appendix E: Cost Engineering

  • Appendix F: Environmental Consequences and Regulatory Compliance

    • Appendix F-1: Biological Assessment

    • Appendix F-2: Essential Fish Habitat Assessment

    • Appendix F-3: No Net Loss Plan

    • Appendix F-4: Clean Water Act Section 404(b)(1) Assessment

    • Appendix F-5: Coastal Zone Management Act Consistency Review

    • Appendix F-6: Draft General Conformity Assessment

    • Appendix F-7: National Historic Preservation Act Compliance

  • Appendix G: Hazardous, Toxic, and Radioactive Waste Assessment

  • Appendix H: Real Estate Plan

Cedar Port Navigation District Channel Deepening Project

Site Links

Home
Overview
Meetings

Documents
Contact